[单选题] 提问人:匿名网友 提问时间:2021-08-24

Hi Tech Corporation is a California based company that has contracted with a separate company in India to handle its customer service call center. Hi Tech Corporation's practice is most accurately described using the term:


A .Offshore operations.
B .Shared services.
C .Globalization.
D .Outsourcing.

提问人:匿名网友 提问时间:2021-08-24

参考答案(由小熊题库网聘请的专业题库老师提供的解答)

请点击↑↑↑ 查看官方参考答案 按钮

习题解析

请点击 查看官方参考答案 按钮

您可能感兴趣的题目


1 .All of the following would generally be included in a cost of quality report, except:

A Design engineering. B Supplier evaluations. C Lost contribution margin. D Warranty claims.

题型: 单选题 提问时间: 2021-08-24

2 .Product-quality-related costs are part of a total quality control program. A product-quality-related cost incurred in detecting individual products that do not conform to specifications is an example of a(n):

A Internal failure cost. B Appraisal cost. C Prevention cost. D External failure cost.

题型: 单选题 提问时间: 2021-08-24

3 .The cost of statistical quality control in a product quality cost system is categorized as a(n):

A Prevention cost. B Internal failure cost. C Appraisal cost. D Training cost.

题型: 单选题 提问时间: 2021-08-24

4 .Which of the following represents an organizational commitment to customer-focused performance that emphasizes both quality and continuous improvement?

A Lean Management. B Total Quality Management. C Activity-based Costing. D Just-in-time.

题型: 单选题 提问时间: 2021-08-24

5 .Which of the following management philosophies does not focus on quality?

A Total Quality Management. B Absolute conformance. C Gap Analysis. D Lean.

题型: 单选题 提问时间: 2021-08-24

7 .A manufacturer that wants to improve its staging process compares its procedures against the check-in process for a major airline. Which of the following tools is the manufacturer using?

A Economic value-added. B Benchmarking. C Total quality management. D Statistical process control.

题型: 单选题 提问时间: 2021-08-24

8 .5. Which of the following is not a method for estimating the cost of a project?

A Reserve Analysis. B Project Management Simulation (PMS). C Vendor bid analysis. D Judgment.

题型: 单选题 提问时间: 2021-08-24

9 .For a fixed-price proposal, the deliverables due on the contract are not clearly defined. As a result, the potential contractor should:

A Build in a cost escalator to adjust for materials price increases during the execution of the contract. B Wait to bid until the deliverables are clearly defined. C Submit the bid because the client's price seems more than adequate to meet the contract requirements. D Modify the terms to account fo...

题型: 单选题 提问时间: 2021-08-24

10 .Increased globalization is made possible by each of the listed factors, except:

A Regulation of currency values through the International Monetary Fund. B Reduced transportation costs. C Technological advancements including improved communications. D Deregulation of international financial markets.

题型: 单选题 提问时间: 2021-08-24

 
如有问题 请联系客服
  • 客服微信