[单选题] 提问人:匿名网友 提问时间:2021-08-23

建设工程合同管理的特点主要是由( )的特点决定。


A .管理制度
B .招标方式
C .建设项目
D .工程合同

提问人:匿名网友 提问时间:2021-08-23

参考答案(由小熊题库网聘请的专业题库老师提供的解答)

请点击↑↑↑ 查看官方参考答案 按钮

习题解析

请点击 查看官方参考答案 按钮

您可能感兴趣的题目


1 .For last year a company had budgeted to absorb overheads at the rate of $5 per direct labourhour and it was estimated that each unit would require 4 direct labour hours. Production wasbudgeted at a level of 2,000 units but actual production was 1,900. It transpired that actualoverheads incurred were $43,000.What was the under/over-absorption of overheads for the year?

A $2,000 over-absorbed B $2,000 under-absorbed C $5,000 over-absorbed D $5,000 under-absorbed

题型: 单选题 提问时间: 2021-08-23

2 .A company has produced its budget for the next year with an estimate of $8,400,000 for fixedproduction overheads and of 1,050,000 for productive labour hours. A pre-determined fixedoverhead absorption rate was calculated on the basis of these figures.Actual results for the year showed fixed overheads of $8,680,000 and productive labour hoursof 1,120,000.What is the total over or under absorption of fixed overheads for the period?

A $262,000 under absorption B $280,000 under absorption C $280,000 over absorption D $560,000 over absorption

题型: 单选题 提问时间: 2021-08-23

3 .What transfer does the $5,000 credit entry represent?

A Under-recovery of fixed production overheads to the income statement B Over-recovery of fixed production overheads to the income statement C Under-recovery of fixed production overheads to the work-in-progress account D Over-recovery of fixed production overheads to the work-in-progress account

题型: 单选题 提问时间: 2021-08-23

4 .Last month actual production overheads exceeded the absorbed production overheads.What accounting entries should be made to close the production overhead account at theend of the month?

A Debit the production overhead account and credit the work-in-progress account B Debit the work-in-progress account and credit the production overhead account C Debit the production overhead account and credit the profit and loss account D Debit the income statement and credit the production overhe...

题型: 单选题 提问时间: 2021-08-23

6 .谈判者利用对方的弱点,猛烈攻击,迫其就范,做出妥协,而对己方的弱点则尽量回避,这种谈判技巧称为( )。

A 起点战略 B 掌握谈判议程 C 避实就虚 D 注意谈判氛围

题型: 单选题 提问时间: 2021-08-23

7 .有经验的谈判者在谈判之初会有意识向对方提出苛刻的条件,使对方过高估计我方的谈判底线,从而在谈判中作出让步,这种谈判技巧称为( )。

A 避实就虚 B 高起点战略 C 注意谈判氛围 D 适当的拖延与休会

题型: 单选题 提问时间: 2021-08-23

8 .发出索赔意向通知后( )内,或工程师可能同意的其它合理时间,承包人应递交正式的索赔报告。

A 15 B 20 C 28 D 60

题型: 单选题 提问时间: 2021-08-23

9 .工程师在收到工期延长报告后( )天内予以确认,逾期不予确认也不提出修改意见,视为同意顺延工期。

A 8 B 12 C 14 D 25

题型: 单选题 提问时间: 2021-08-23

10 .以下关于索赔的说法中,不正确的是( )。

A 索赔具有双向性 B 索赔只能由承包商向业主提出 C 索赔以实际发生了经济损失或权利损害为前提 D 索赔是一种未经对方确定的单方行为

题型: 单选题 提问时间: 2021-08-23

 
如有问题 请联系客服
  • 客服微信