[单选题] 提问人:匿名网友 提问时间:2021-08-24

An information technology director collected the names and locations of key vendors, current hardware configuration, names of team members, and an alternative processing location. What is the director most likely preparing?


A .Disaster recovery plan.
B .System security policy.
C .System hardware policy.
D .Data restoration plan.

提问人:匿名网友 提问时间:2021-08-24

参考答案(由小熊题库网聘请的专业题库老师提供的解答)

请点击↑↑↑ 查看官方参考答案 按钮

习题解析

请点击 查看官方参考答案 按钮

您可能感兴趣的题目


1 .Vulnerable Corporation has its data centersin Ft. Lauderdale, Miami, and Galveston. Since each of these locations issomewhat susceptible to hurricanes, Vulnerable is considering developing adisaster recovery plan. Which of the following statements is/are incorrect fordisaster recovery? I. Vulnerable uses application software packages. The license agreements for the packages usually provide the license holder the right to make backup copies of the software for disaster recovery purposes. II. Disaster recovery plans are limited to the restoration of IT processing. III. The major emphasis in disaster recovery is on the restoration of hardware and telecommunication services.

A I and III only are incorrect. B II and III only are incorrect. C I and II only are incorrect. D I, II, and III are incorrect.

题型: 单选题 提问时间: 2021-08-24

2 .In which of the following locations should a copy of the accounting system data backup of year-end information be stored?

A Locked file cabinet in the accounting department. B Fireproof cabinet in the data network room. C Data backup server in the network room. D Secure off-site location.

题型: 单选题 提问时间: 2021-08-24

3 .To prevent interrupted information systems operation, which of the following controls are typically included in an organization's disaster recovery plan?

A Backup and downtime controls. B Data input and downtime controls. C Backup and data transmission controls. D Disaster recovery and data processing controls.

题型: 单选题 提问时间: 2021-08-24

4 .Which of the following configurations of elements represents the most complete disaster recovery plan?

A Vendor contract for alternate processing site, backup procedures, names of persons on the disaster recovery team. B Vendor contract for alternate processing site, names of persons on the disaster recovery team, off-site storage procedures. C Alternate processing site, backup and off-site storage p...

题型: 单选题 提问时间: 2021-08-24

5 .The performance audit report of an information technology department indicated that the department lacked a disaster recovery plan. Which of the following steps should management take first to correct this condition?

A Bulletproof the information security architecture. B Prepare a statement of responsibilities for tasks included in a disaster recovery plan. C Designate a cold site. D Designate a hot site.

题型: 单选题 提问时间: 2021-08-24

7 .A controller is developing a disaster recovery plan for a corporation's computer systems. In the event of a disaster that makes the company's facilities unusable, the controller has arranged for the use of an alternate location and the delivery of duplicate computer hardware to this alternate location. Which of the following recovery plans would best describe this arrangement?

A Hot spare site agreement. B Hot site. C Back-up site procedures. D Cold site.

题型: 单选题 提问时间: 2021-08-24

8 .Bacchus, Inc. is a large multinational corporation with various business units around the world. After a fire destroyed the corporate headquarters and largest manufacturing site, plans for which of the following would help Bacchus ensure a timely recovery?

A Daily backup. B Network security. C Backup power. D Business continuity.

题型: 单选题 提问时间: 2021-08-24

9 .Which of the following best describes a hot site?

A Location that is equipped with the necessary hardware and possibly software. B Location where a company can install data processing equipment on short notice. C Location that is considered too close to a potential disaster area. D Location within the company that is most vulnerable to a disaster.

题型: 单选题 提问时间: 2021-08-24

10 .Which of the following procedures would an entity most likely include in its disaster recovery plan?

A Convert all data from EDI format to an internal company format. B Maintain a Trojan horse program to prevent illicit activity. C Develop an auxiliary power supply to provide uninterrupted electricity. D Store duplicate copies of files in a location away from the computer center.

题型: 单选题 提问时间: 2021-08-24

 
如有问题 请联系客服
  • 客服微信