[单选题] 提问人:匿名网友 提问时间:2021-08-23

A company uses an overhead absorption rate of $3·50 per machine hour, based on 32,000budgeted machine hours for the period. During the same period the actual total overheadexpenditure amounted to $108,875 and 30,000 machine hours were recorded on actualproduction.By how much was the total overhead under or over absorbed for the period?


A .Under absorbed by $3,875
B .Under absorbed by $7,000
C .Over absorbed by $3,875
D .Over absorbed by $7,000

提问人:匿名网友 提问时间:2021-08-23

参考答案(由小熊题库网聘请的专业题库老师提供的解答)

请点击↑↑↑ 查看官方参考答案 按钮

习题解析

请点击 查看官方参考答案 按钮

您可能感兴趣的题目


1 .工程项目风险识别的最主要成果是( )。

A 风险流程 B 风险发生的概率 C 风险清单 D 风险后果集

题型: 单选题 提问时间: 2021-08-23

2 .下列方法中,可用于工程风险分析与评价的是( )。

A 敏感性分析法 B 流程图分析法 C 财务报表分析法 D 初始风险清单法

题型: 单选题 提问时间: 2021-08-23

3 .某工程双代号网络计划如下图所示,图中已标出各项工作的最早开始时间和最迟开始时间,该计划表明( )。

A 工作1-3的自由时差为零 B 工作2-4的自由时差为2 C 工作2-5为关键工作 D 工作3-5的总时差为零 E 工作4-6的总时差为2

题型: 多选题 提问时间: 2021-08-23

4 .某工程双代号网络计划如下图所示,图中已标出的各个节点的最早时间和最迟时间,该计划表明( )。

A 工作1-2的自由时差为2 B 工作2-5的总时差为7 C 工作3-4为关键工作 D 工作3-5为关键工作 E 工作4-6的总时差为零

题型: 多选题 提问时间: 2021-08-23

5 .

A $11 B $12 C $14 D $15

题型: 单选题 提问时间: 2021-08-23

7 .A cost centre has an overhead absorption rate of $4·25 per machine hour, based on a budgetedactivity level of 12,400 machine hours.In the period covered by the budget, actual machine hours worked were 2% more than thebudgeted hours and the actual overhead expenditure incurred in the cost centre was $56,389.What was the total over or under absorption of overheads in the cost centre for theperiod?

A $1,054 over absorbed B $2,635 under absorbed C $3,689 over absorbed D $3,689 under absorbed

题型: 单选题 提问时间: 2021-08-23

8 .

A $122,400 B $124,716 C $126,000 D $127,000

题型: 单选题 提问时间: 2021-08-23

9 .

A $10 B $11 C $12 D $13

题型: 单选题 提问时间: 2021-08-23

10 .A manufacturing company uses a machine hour rate to absorb production overheads, whichwere budgeted to be $130,500 for 9,000 machine hours. Actual overheads incurred were$128,480 and 8,800 machine hours were recorded.What was the total under absorption of production overheads?

A $880 B $900 C $2,020 D $2,900

题型: 单选题 提问时间: 2021-08-23

 
如有问题 请联系客服
  • 客服微信